Opportunities to Supply to CQUniversity
CQUniversity supports the opportunity for Australian Industry to participate in our tendering process in accordance with the Australian Industry Participation initiative. A list of current and upcoming projects at CQUniversity, currently listed tenders and information on registering interest to work with us can be found through this site.
ABOUT CQUNI
Current Major Opportunities and Projects
Details
Project is to support emerging and future skills needs through the provision of new facilities at Gladstone & Rockhampton. It aims to deliver new infrastructure built around the existing facilities and new courses including state of the art equipment, utilise new teaching models that will support industry advancement of robotics, Artificial Intelligence and remote operations, provide a platform for engagement with industry stakeholders and support the growing need and change within industry.
Proposed Dates
- Start: Commenced 2020
- Finish:
- Rockhampton Site – Practical Completion to be reached 11 March 2022
- Gladstone Site – Practical Completion to be reached 16 December 2021
Project Contact
Michael Wakeham
Senior Project Manager
dfmprojects@cqu.edu.au
Related Documents
NIL at this time.
Chiller Ringmain Rockhampton North Campus
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Mark Brown
Details: TBC
Rockhampton City Block E - Replace 3 ducted units
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Mark Brown
Details: TBC
Gladstone Building 604 Upgrade to chilled water system
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Mark Brown
Details: TBC
Mackay Ooralea Compressors for Building 20 & 21
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Mark Brown
Details: TBC
Emerald Building 1 Level 2 AC Replacement
Proposed Start Date: February 2021
Proposed Finish Date: April 2021
Contact: Matt Dewar
Details: Project is designed to replace the ageing Air Conditioning unit in Building 1 at the Emerald campus.
Mackay Ooralea Drive Reseal
Proposed Start Date: June 2021
Proposed Finish Date: July 2021
Contact: Wayne Milsom
Details: Project is designed to replace the damaged Driveway at the Mackay, Oooralea Campus.
Rockhampton North Building 5 Room 2.06 Carpet replacement
Proposed Start Date: March 2021
Proposed Finish Date: March 2021
Contact: John Saunders
Details: Project is designed to replace the worn and outdated carpets in Building 5 at the North Rockhampton campus.
Rockhampton North Building 2 & 31 Carpet Upgrades
Proposed Start Date: May 2021
Proposed Finish Date: May 2021
Contact: Mark Brown
Details: Project is designed to replace the worn and outdated carpets in Building 2 and 31 at the North Rockhampton campus.
Rockhampton North Building 81 Seamless Flooring Upgrade
Proposed Start Date: June 2021
Proposed Finish Date: July 2021
Contact: Mark Brown
Details: Project is designed to install new seamless flooring in Building 81 at the North Rockhampton campus.
Mackay Ooralea Building 19 Carpet Replacement
Proposed Start Date: May 2021
Proposed Finish Date: May 2021
Contact: Wayne Milsom
Details: Project is designed to replace the worn and outdated carpets in Building 19 at the Ooralea, Mackay campus.
Emerald Building 4 Epoxy Flooring Upgrade
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Aaron Hardman
Details: Project is designed to upgrade the epoxy floor surfacing in Building 4 at the Emerald campus.
Mackay City Building 4 External Awning Works
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Mark Brown
Details: Project is designed to upgrade the external awnings at Mackay City campus.
Rockhampton Bld 9 & Emerald Building 1 Lift Replacements
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Mark Brown
Details: Project is designed to improve safety and reliability of people transport at the Rockhampton and Emerald campuses..
Rockhampton North Student Residence - Fire door partition upgrades
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Grant Farrell
Details: Project is designed to upgrade the fire door partitions in the student residence at the North Rockhampton campus.
Rockhampton North Building 9 & 79 Hydrant and fire diesel pump upgrades
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: Grant Farrell
Details: Project is designed to upgrade the hydrant and fire diesel pumps at the North Rockhampton campus.
Rockhampton North Building 8 RO Plant Replacement
Proposed Start Date: May 2021
Proposed Finish Date: May 2021
Contact: Grant Farrell
Details: TBC
Rockhampton North Building 9 Oil-less Compressor Replacement
Proposed Start Date: April 2021
Proposed Finish Date: May 2021
Contact: Grant Farrell
Details: TBC
Rockhampton North Various Fire Panel Replacements
Proposed Start Date: May 2021
Proposed Finish Date: July 2021
Contact: Grant Farrell
Details: Project is designed to upgrade the fire panels to meet code in various buildings of the North Rockhampton campus.
Emerald Building 1 Fire Panel Replacement
Proposed Start Date: May 2021
Proposed Finish Date: July 2021
Contact: Grant Farrell
Details: Project is designed to upgrade the fire panels to meet code in Building 1 of the Emerald campus.
Mackay Building 63 Fire Panel Replacement
Proposed Start Date: May 2021
Proposed Finish Date: July 2021
Contact: Grant Farrell
Details: Project is designed to upgrade the fire panels to meet code in Building 63 of the Mackay campus.
Mackay City Building 4 Switchboard Upgrade
Proposed Start Date: May 2021
Proposed Finish Date: June 2021
Contact: Grant Farrell
Details: Project is designed to upgrade the electrical switchboard in Building 4 of the Mackay City campus.
Upgrades to meeting, teaching and general spaces across QLD Campuses
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: TBC
Details: Project is designed to modernise and create learner centric spaces for our students to collaborate and learn within.
Radar Speed Signs Gladstone & Rockhampton
Proposed Start Date: May 2021
Proposed Finish Date: May 2021
Contact: Wayne Milsom
Details: Project is designed to increase pedestrian safety by identifying driver speeds on campus roads.
Mackay City Building 4 Room 2.38 AC Replacements
Proposed Start Date: May 2021
Proposed Finish Date: May 2021
Contact: Matt Dewar
Details: Project is designed to replace the ageing Air Conditioning unit in Building 4 at the Mackay City campus.
Townsville ERIC VR Patients Training System
Proposed Start Date: March 2021
Proposed Finish Date: March 2021
Contact: Raquel Creek
Details: Project is designed to provide students with VR training facilities at the Townsville campus.
NAIF Medical School
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: TBC
Details: TBC
Noosaville Education Teach Out Site
Proposed Start Date: TBC
Proposed Finish Date: TBC
Contact: TBC
Details: TBC
School of Mines Rockhampton North
Proposed Start Date: January 2021
Proposed Finish Date: March 2022
Contact: Michael Wakeham
Details: TBC
School of Manufacturing
Proposed Start Date: January 2021
Proposed Finish Date: January 2022
Contact: Michael Wakeham
Details: TBC
Personal Student Journey - Digital Experience Platform (ITX)
Proposed Start Date: January 2021
Proposed End Date: December 2021
Contact: Jeffrey Santamaria
Details: Project is a series of experience based digital transformation projects to improve our students' experience on our digital platforms.
Learning Spaces (Personal Student Journey - TEX)
Proposed Start Date: January 2021
Proposed End Date: December 2021
Contact: Paul Holbeck
Details: Project is a series of upgrades to physical teaching space and technology deployment.
Student Admin Systems Upgrades and Enhancements
Proposed Start Date: January 2013
Proposed End Date: December 2021
Contact: TBC
Details: Project involves upgrades and enhancements to our student admin systems.
Finance Systems - Upgrade and Enhancements
Proposed Start Date: January 2014
Proposed End Date: Ongoing
Contact: Guy Gunarathna
AIMS - Enhancements
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: TBC
Details: Project aims to develop and upgrade the In-house Academic Information System software.
Network Equipment Upgrades - All campuses
Proposed Start Date: January 2018
Proposed End Date: December 2021
Contact: Julianne Weekers
Details: Project is a series of upgrades to general network equipment at all CQU campus locations.
Datacentre, Server and Backup Upgrades
Proposed Start Date: January 2021
Proposed End Date: December 2022
Contact: Aaron Slater
Details: Project is a series of upgrades to our Datacentres.
Online Systems Mandatory Upgrades - Digital Learning Environment (Moodle)
Proposed Start Date: January 2019
Proposed End Date: Ongoing
Contact: TBC
Details: Project is a series of upgrades to our core teaching platforms.
Research Systems Upgrade and Expansion
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: Peter Vanheck
Details: Project is a series of upgrades to our research platforms.
Cybersecurity Maturity and Awareness
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: Peter Vanheck
Details: Project aims to assess CQU's cybersecurity maturity and awareness.
HE Student Lab Computers - Annual Refresh (4 year cycle)
Proposed End Date: TBC
Contact: TBC
Details: Project is a series of upgrades to the computer hardware in our student computer labs.
DataSmart - CQU Data Warehouse and Analytics Platform
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: TBC
Details: Project is a series of enterprise business intelligence system capability expansions.
Be Different IaTD Platform Expansion
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: TBC
Details: TBC
Human Capital Management - Enabled Capability
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: Mark Western
Details: Project is a series of expansions to our human capability and management programs as well as occupational health and safety platforms.
Enhance International Recruitment through StudyLink
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: TBC
Details: Project aims to streamline our international recruitment processes.
Web site - Lead generation enhancements
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: Peter Vanheck
Details: TBC
ACS Hybrid Network/Computer Labs
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: Aaron Slater
Details: TBC
Digital Transformation - Automate Operations
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: TBC
Details: TBC
Higher Education Course Delivery Assets
Proposed Start Date: TBC
Proposed End Date: TBC
Contact: TBC
Details: TBC
Current Open Tenders
CQUniversity’s method for receiving tender submissions is through the Queensland Government tender portal, QTender.
List of current opportunities to tender with CQUniversity.
Registering Interest in Upcoming Projects
Contractors and Suppliers interested in working with CQUniversity should ensure they are appropriately registered for QTender notifications. If you have not yet registered for QTender, you can register on qtenders.hpw.qld.gov.au.
If you are already registered for QTender, CQUniversity recommends checking your details are all up to date by logging in and updating your profile.
Contact can also be made with the appropriate Project Contact listed under the ‘Current Major Opportunities and Projects’
How to View documents and Submit Reponses for Major Opportunities and Projects
Important documents, requirements and specifications are all listed on via the QTender website.
List of current opportunities to tender with CQUniversity.
Contractor and Supplier Policies
CQUniversity is committed to the safety and wellbeing of all staff, students, visitors and contractors involved in the operations of CQUniversity.
As a result of our commitment to safety and wellbeing, CQUniversity ensures safety and wellbeing through compliance with the Work Health and Safety Act 2011 (Qld). The requirements under this Act requires Contractors and Suppliers to provide services in a manner that ensures compliance with the health and safety measures.
The following CQUniversity documents (including but not limited to) are also implemented to ensure the safety and wellbeing of all parties involved:
- Asbestos Registers
- Asbestos Safety Policy and Procedure (Asbestos Management Plan)
- Code of Conduct
- Confined Spaces and Restricted Areas Procedure
- Electrical Equipment Use Procedure
- Electrical Safety Policy
- Incident and Hazard Reporting and Investigation Procedure
- Occupational Health and Safety Policy
- Test and Tag Procedure
- Work Health and Safety Roles and Responsibilities Procedure
For a comprehensive list of CQUniversity Policies and Procedures, refer to the Policy Portal.